- Building and Level IDs
- Customize strategy analysis columns
- Distribute department among different levels of real-estate
- Functional (F), Comfort (C) & Luxury (L) types of fits
- Generate a new strategy or program analysis
- Import design data into strategy - existing conditions
- Import design data into strategy - reconfiguration
- View Strategy Reports
- View zones by departments & spaces which are part of these zones
- What is Level Numbering Schema?
-
-
-
- How to Automate Distance Ring Collisions?
- How to Group Distance Rings?
- How to Manually Apply and Manipulate Distance Rings?
- How to Move Colliding Rings to Another Group?
- How to Set Default Distance Rings Settings?
- How to Tag Seats?
- Saltmine's Re-Entry Planning Overview
- The complete process of applying distance rings manually & automatically.
- The complete process of optimizing distance ring collisions and extracting reports.
How to tag a project to an existing site?
With the addition of Sites, the Status of a project is now integral to the workflow of a project’s life-cycle.
As Finalization Statuses, in order to transition a project to Designed, Construction, or Built you will first need to Finalize some project information. This will require association to a Building, Address, a Scenario with complete Strategy and corresponding design files. Once this is completed, the project will be associated with a Site. A project can only be tagged to a site when it is in the Construction and Built status.

Was this article helpful?