- Check your browsers’ Graphics Processing Unit (GPU) [Update Feb 2021]
- Configuring your browser
- Configuring your browser
- Graphics Requirements
- Graphics requirements
- Hardware specifications
- How to Generate Network Captures for Troubleshooting
- Use diagnostic tools to find and fix issues
- Web Browser
- Web Browser(Private)
-
-
-
- Building and Level IDs
- Customize strategy analysis columns
- Distribute department among different levels of real-estate
- Editing Space Types
- Functional (F), Comfort (C) & Luxury (L) types of fits
- Generate a new strategy or program analysis
- Import design data into strategy - existing conditions
- Import design data into strategy - reconfiguration
- Mix of Spaces Recommendation (Recommended Units)
- New Test Fit Checklist - New Project
- Recommendations: Mobility Percentage
- View Strategy Reports
- View zones by departments & spaces which are part of these zones
- What is Level Numbering Schema?
-
-
- How to Automate Distance Ring Collisions?
- How to Group Distance Rings?
- How to Manually Apply and Manipulate Distance Rings?
- How to Move Colliding Rings to Another Group?
- How to Set Default Distance Rings Settings?
- How to Tag Seats?
- Saltmine's Re-Entry Planning Overview
- The complete process of applying distance rings manually & automatically.
- The complete process of optimizing distance ring collisions and extracting reports.
Updating As-built Designs
This process starts with a design file that is part of a Building/Floor in the built status.
Create a New Project
In Saltmine on the projects homepage select the + New Project button.
After selecting the + New Project button the add new project page will open. On the details tab add the project name (the below name has the project name, the building code, and the date) and details for this project. Make sure the region and office type matches the building that is being updated.

On the team tab add the required team members to the new project with the necessary access levels. This can also be done after the project has been created.

After the project has been created the building(s) that require updating will need to be added to the new project. Start by selecting the info icon next to the new scenario in the project.Â

Add Real Estate to Update
Selecting the info icon will open the Edit Scenario dialog. From this dialog the building(s) can be added to the project.
Using the Assign Real Estate dropdown select the site that requires updating. Once the site has been selected the required building(s) and floor(s) can be added by selecting the check box next to each floor in the required buildings.
Selecting save will automatically add the strategy and design file from the current as-builts for the selected real estate.

There is now one design that has been added to the new scenario as well as the strategy that is tied to that design.

Update Design File(s) and Strategy
Now that the strategy and design have been added they can both be updated like any other project to reflect the necessary changes that need to be made. Once all of the updates to the strategy and design files have been completed, the project can then be moved to the built status to promote this design to the current as-built.